Compare

Hudbay Minerals/$HBM

Hudbay Minerals shares fall as copper prices weaken amid doubts over returns on AI spending, a technology sell-off and higher oil prices stoking global growth concerns.
8 hours agoLightyear AI
1D1W1M3M6MYTD1Y5YMAX

About Hudbay Minerals

Hudbay Minerals Inc is a copper-focused critical minerals company with three long-life operations and a pipeline of copper growth projects in Canada, Peru, and the United States. Its operating portfolio includes the Constancia mine in Cusco (Peru), the Snow Lake operations in Manitoba (Canada), and the Copper Mountain mine in British Columbia (Canada). Copper is the primary metal produced by the company, which is complemented by gold, zinc, silver, and molybdenum production. Hudbay's growth pipeline includes the Copper World project and the Mason project in the USA, and the Llaguen project in Peru. The company's reportable segments are: Peru, which generates the maximum revenue, Manitoba, British Columbia, and Arizona. Geographically, it generates maximum revenue from China and Canada.
Ticker
$HBM
Sector
Materials
Primary listing
NYSE
Employees
2,242
Headquarters
Toronto, Canada

Hudbay Minerals Metrics

BasicAdvanced
$10B
13.67
$1.71
2.26
$0.02
0.12%

What the Analysts think about Hudbay Minerals

Analyst ratings (Buy, Hold, Sell) for Hudbay Minerals stock.
Analyst projections of the future price of Hudbay Minerals stock.

Bulls say / Bears say

Hudbay and Mitsubishi have approved Copper World, targeting first production in the second half of 2029 and about 102,000 tonnes of annual copper output over its first decade. Mitsubishi, Wheaton and project-level financing are expected to cover much of the initial capital, with Hudbay’s first contribution deferred until 2028. (Hudbay Minerals)
Operations generated more than $200 million of free cash flow in the first half of 2026, and Hudbay improved its full-year copper cash-cost guidance to between negative $0.45 and negative $0.25 per pound. Its second-quarter net cash position gives it room to fund growth while maintaining financial flexibility. (Hudbay Minerals)
Hudbay’s updated Snow Lake plan extends reserve mine life to 2043 and raises average annual gold production for 2026–30 by 37% against the prior plan. That strengthens the company’s near-term gold contribution and broadens its production base beyond copper. (Hudbay Minerals)
Copper World requires $2.07 billion of initial growth capital, and its base-case after-tax NPV is $1.2 billion at $5 copper compared with $2.3 billion at $6. That leaves project value materially sensitive to long-term copper prices and construction delivery. (Hudbay Minerals)
British Columbia’s second-quarter copper cash cost was $3.22 per pound, above its full-year guidance range of $1.50–$2.50, with fuel costs and maintenance timing contributing to the miss. The operation must deliver the expected second-half improvement for Hudbay to meet its cost plan. (Hudbay Minerals)
At Constancia, depletion of the high-gold Pampacancha stockpile reduced gold by-product credits; combined with higher fuel costs and planned maintenance, Peru cash cost rose to $1.66 per pound in the second quarter from $0.70 in the first. That illustrates how a less favourable ore mix can weaken the low-cost profile. (Hudbay Minerals)
Data summarised monthly by Lightyear AI. Last updated on 30 Oct 2026.

Hudbay Minerals Financial Performance

Revenues and expenses
Income statement
QuarterlyAnnual
Q3 24
QoQ growth
Revenue
Net income
Profit margin

Hudbay Minerals Earnings Performance

Company profitability
Earnings per share
QuarterlyAnnual
Q4 23
Q1 24
Q2 24
Q3 24
Q4 24
Actual
Expected
Surprise

Funds containing Hudbay Minerals

AllUSDEURGBP
Data displayed above is indicative only and its accuracy or completeness is not guaranteed. Actual execution price may vary. Past performance is not indicative of future results. Your return may be affected by currency fluctuations and applicable fees and charges. Capital at risk.
Real-time US market data is sourced from the IEX order book provided by Polygon. After-hours US market data is 15 minutes delayed and may differ significantly from the actual tradable price at market open.